Civil, stormwater drainage & hardstand

Chinchilla, Qld

 

BOC Gas & Gear site, Chinchilla required unloading and loading hardstand over top of storm water easement.

 

600 mm diametre concrete storm water pipe under 500 m² are of concrete hardstand.

 

IMG_1794
IMG_1753
IMG_17331
IMG_1767
IMG_1790
IMG_1794IMG_1753IMG_17331IMG_1767IMG_1790